How to fill the JTAG cable’s housing (Compute Blade)

You have the P1 cable for an Acorn on a Compute Blade with its wires flagged and crimped, and are putting them into their housing. On this page: which wire goes in which cavity, and a meter check of every wire.

This procedure is waiting for its bench run: issue #219.

Photos: Uptime Lab (Compute Blade), RHS Research (LiteFury underside; the Acorn is the same PCB).

What you need

Parts

Tools

  • a paint pen, or a dot of tape

  • a multimeter with a continuity buzzer, and a fine probe or a sewing pin

Steps

1. Hold the empty 2×5 housing with the wire openings facing you and its long side upright, as in the picture. Until it is marked, either way up is the same. Mark the top left corner with a paint pen or a dot of tape: that is the pin 1 corner. For each wire, read the number on its flag and find the same number in the picture: that is the cavity its terminal goes in.

Turned round, the housing puts 5 V on the TCK wire. That is above the most AMD’s Artix 7 data sheet allows on an FPGA pin (DS181, Table 1). The most it allows is VCCO + 0.55 V, with VCCO at most 3.6 V. Exceeding it can destroy the FPGA pin on the Acorn that wire reaches. Wire 6 goes in no cavity.

Which wire goes in which cavity, P1 cable Which wire goes in which cavity, P1 cable

2. Push each terminal into its cavity, latch tab towards the window, until it clicks. Pull each wire gently: the terminal must stay in. The P1 cavity picture is shown again under the picture of how a terminal goes in, to read each wire’s cavity from.

Which way round a terminal goes in, and the pull test Which way round a terminal goes in, and the pull test

Which wire goes in which cavity, P1 cable Which wire goes in which cavity, P1 cable

3. Check each wire with a meter on continuity. Set the meter to continuity. The probes go as in the picture: one on a contact of the plug, the other on a terminal. The other probe goes through the opening on the pin side of the housing. The plug’s contacts are 1.2 mm apart: use a fine probe or a sewing pin held to the probe.

A meter between the plug and the housing A meter between the plug and the housing

4. Then check each wire against its cavity. For each wire: read the number on its flag and find it in the picture. Put one probe on that wire’s contact on the plug and the other on the terminal in that cavity: it must beep. Every other cavity must stay silent for that contact.

The P1 cavity picture is shown again below, to read each wire’s cavity from.

Which wire goes in which cavity, P1 cable Which wire goes in which cavity, P1 cable

Check

Each wire beeps from its contact on the plug to the terminal in its own cavity (steps 3 and 4). Every other cavity stays silent for that contact.

If it fails

A terminal is in the wrong cavity: a Dupont housing holds each terminal by a small plastic tab over its latch, in the window. Lift that tab a little with a pin and pull the wire gently: the terminal comes out, and can be pushed into the right cavity.

Next

How to prepare the UART cable’s wires (Compute Blade).